Comprehensive kitchen renovation↗
Coordinated work, installations, furniture and finishes.
When keeping some pieces, the order of removal and placement matters. An added floor can modify the opening of an appliance or the bottom edge of a door. Before separating both works, it is advisable to identify what will remain supported on the finished surface and what element cannot be dismantled during this preparation.
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Coordinated work, installations, furniture and finishes.
Winning drawers doesn't help if they later collide with a handle.
The appliances you keep may depend on panels attached to the furniture.
If we reserve free spaces, an irregular wall still needs finishing.
The actual angle between the walls may differ from the drawing.
Moving the sink forces you to look at where the water will come out.
In a kitchen floor change, the preparation must relate to skirting boards, entrances and preserved equipment. If the furniture is also changed, the two actions need a common height reference. It is not enough for each supplier to know their piece if the joint between the two remains to be resolved. See also: changing kitchen floor.
When installing furniture you must know what support you receive and what adjustments you will need to make. The proposal can distinguish disassembly, preparation and placement to explain how the assembly is completed. This distribution allows a partial work to be contracted without leaving an inaccessible surface or a union that no one had contemplated finishing. See also: furniture installation.
Full renovation: €475–1,900/m² as a planning reference. Individual jobs may cost less. See the itemised quotation.