Our way of thinking about cooking
A description such as assembly can cover different tasks depending on the order. It is advisable to specify which pieces are placed, which supports are prepared and which joints are finished. Being able to relate the game to an element of the plan helps to ask about its scope before deciding, without depending on terms that each proposal can use differently.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
How we shape your kitchen at Marbella
- 01
Listen and measure
- 02
Layout and materials
Which surfaces will be most exposed to frequent use.
- 03
Written proposal
How joints and visible edges are perceived.
- 04
Assembly and inspection
What care does the finishes that interest you require?
Limits are explained before coordinating suppliers
If a worktop or appliance arrives by another means, you have to know what is received prepared and what is left pending. In the assembly of kitchen furniture, this coordination affects supports, gaps and finishes. Clarifying the distribution allows you to recognize who finishes each operation and what verification the next job requires. See also: kitchen furniture assembly.
What remains to be decided remains part of the conversation
A material reference or dimension can remain open during preparation. It must be identified so as not to treat it as a confirmed election. In the renovation proposal, these points can be separated from the work already defined, so that the alternatives are assessed with their conditions in view.